Verbundvorhaben, Schlussbericht im Rahmen des 7. Energieforschungsprogramms der Bundesregierung "Gebäude und Quartiere"


World Heritage Site: Speicherstadt and Kontorhaus District with Chilehaus

Publication Year: 2026

Publication Type: Report

Publication Identifier: WHE06DB5CCE6D

Summary

Integrated energy renovation and supply strategies for heritage buildings can significantly reduce emissions, but their effectiveness depends on adaptive operational approaches. The 0-CO2-WSHH project demonstrated that combining denkmal-compliant insulation, renewable energy systems (e.g., thermally activated roofs), hybrid thermal storage, and low-temperature heat distribution in a UNESCO-listed warehouse block achieved substantial decarbonization—though real-world performance hinged on occupancy patterns and dynamic control. A digital BIM platform linked with simulations further optimized outcomes by bridging data gaps between modeling and reality. The study underscores the need for systematic validation of complex systems in heritage contexts, offering scalable methods to balance conservation, energy efficiency, and climate neutrality.

Citation

Garrecht, Harald, Modlich, Peter, Bögle, Annette, & Müller, Dirk. (2026). CO2-neutrales Welterbe Speicherstadt Hamburg - Phase I - Umsetzung und Begleitung der Konzepterstellung und des Großdemonstrators im Rahmen der energie- und umweltgerechten Sanierung des Block H der Speicherstadt Hamburg (0-CO2-WSHH). München : oekom verlag. https://doi.org/10.34657/29909

You are here:
World Heritage Explorer > World Heritage Research > Publications > Verbundvorhaben, Schlussbericht im Rahmen des 7. Energieforschungsprogramms der Bundesregierung "Gebäude und Quartiere"

This website includes data sources licensed under CC BY-SA 4.0. Additional original content by World Heritage Explorer, also licensed under CC BY-SA 4.0. WHE is not affiliated with UNESCO or the World Heritage Committee. Legal Notice. Privacy Policy.

Open Data for an Open World