The Fourth Bridge over the Grand Canal in Venice: From Idea to Analysis and Construction


World Heritage Site: The Grand Canal

Publication Year: 2010

Publication Type: Article

Publication Identifier: WHE435B3AB3AA

Summary

A novel approach to bridge design and construction was successfully implemented for the Fourth Bridge over Venice's Grand Canal, showcasing innovative solutions that address the challenges posed by the city's unique soil conditions. The bridge, featuring a single 80-meter span 'Vierendeel' arch with a span/rise ratio of 1/16, required modifications to its design to enhance structural stiffness without altering its external appearance. Pre-assembly and loading simulations, along with extensive monitoring, were employed to ensure the structure's stability during erection. Full-scale static tests conducted before and after construction validated the bridge's performance under real-world conditions, demonstrating a successful integration of advanced engineering techniques in a UNESCO World Heritage Site.

Citation

Zordan, T., Briseghella, B., & Siviero, E. (2010). The Fourth Bridge over the Grand Canal in Venice: From Idea to Analysis and Construction. Structural Engineering International, 20(1), 6–12. https://doi.org/10.2749/101686610791555667

You are here:
World Heritage Explorer > World Heritage Research > Publications > The Fourth Bridge over the Grand Canal in Venice: From Idea to Analysis and Construction

This website includes data sources licensed under CC BY-SA 4.0. Additional original content by World Heritage Explorer, also licensed under CC BY-SA 4.0. WHE is not affiliated with UNESCO or the World Heritage Committee. Legal Notice. Privacy Policy.

Open Data for an Open World